Birth Certificate
Death Certificate
Butler County Health Department About Butler County Health Department Calendar Employment Opportunities Contact Us
Sheriff's Blog
Public Health
Emergency Preparedness
Community Assessment
Links
Food Inspections
Public and Private Water
Waste Management
Epidimiology
Lodging Inspections
Animals and Insects
Come Visit Us!

1619 North Main
Poplar Bluff, MO 63901

(Phone) 573-785-8478
(Fax) 573-785-2825

Hours: 8am - 5pm Mon - Fri

Email Us! info@butlercountyhealth.org


Who does the State Statute affect?

  1. Individuals constructing new homes, on lots less than three acres that requires the installation of an on-site sewage system.
  2. Individuals’ making major repairs to on—site sewage systems on lots less than three acres.
  3. Individuals requesting on-site sewage evaluations of newly constructed sewage systems from the Health Department, for the purpose of satisfying lending institutions or other interested parties.
  4. Individuals with failing sewage systems that create a nuisance or health hazard regardless of lot size.
  5. Individuals who own property adjacent to lakes regulated by a Public Utility or the United States Army Corps of Engineers, regardless of size.
  6. Individuals who perform soil evaluation, install, design or operate sewage systems

           For a current listing of Registered Onsite Wastewater Treatment (ROWT) Installers

           in Butler County, click here.

 back to top


When is a permit required?

  1. A permit is required prior to the construction or major repair of a sewage system for single-family residences located on lots less than three acres in size.
  2. A permit is required prior to the construction or major repair of a sewage system serving a facility other than a single-family residence, regardless of lot size. (examples: churches, commercial properties, more than one residence on one property deed, etc.)
  3. A permit is required prior to the construction or major repair of a sewer system on any lot that is adjacent to a lake regulated by a Public Utility or the United States Army Corps of Engineers.
  4. A permit is required regardless of lot size when, during a compliant investigation, a home is found to be in violation of ROMs 701.025 through 701.059. Under the complaint procedure, a permit would be required for either a new installation or for a major repair to the existing system.

           Click here for more information, from the Department of Health and Senior Services.

back to top


Where do I get a permit?

The Butler County Health Department (BCHD) will provide application forms and issue permits. Permit and application information can also be obtained from any District office of the Missouri Department of Health or from the Central office in Jefferson City at (573) 751-6095.

You may also print an application and instructions by clicking the links.

back to top


What is the cost of a permit?

A permit cost $90.00. Although permit fees from counties that do not have their own ordinances such as Butler, go to Fee Receipts in Jefferson City, $65.00 from each permit returns to the Butler County Health Department.

You may also print a fee application by clicking the link.

back to top


How long does the permit application process take?

Usually about one week. All but the most difficult applications are processed at the Butler County Health Department. The Missouri Department of Health issues permit numbers to Butler County as soon as the permit fee is received. The Butler County Health Department may then issue the permit as soon as the local Environmental Public Health Specialist approves the application.

back to top


Is the soil test required before a system is repaired or a new system constructed?

Yes. A soil morphology report is an essential port of the system design However, if a morphology report exists from a prior installation, as long as it is in the same area as the repair, it may be used.

back to top


Can a permit be denied?

Yes. If a system in inappropriately designed, will not fit the lot it was designed for, or it is evident that an on-site system will create a health hazard, a permit can be denied. If such an event occurs, the homeowner will be directed to the appropriate state agency that can provide assistance. The Missouri Department of Health District offices will also lend technical assistance where needed to help coordinate between other state agencies and the homeowner.

back to top

 
 
The Butler County Health Department is An Equal Opportunity/Affirmative Action Employer
Services provided on a non-discriminatory basis
West Nile Virus
Animals/Rabies
What We Do
Sewage FAQ
Inspection Reports
Food Protection
Food Recall
Foodborne Illness
Temporary Stands
Food Complaint Form
Bio Terrorism
WIC
Immunizations
Family Planning
HIV
STD's
In Home Service
Consumer Directed Services
Health Education
Genetic Testing
Health Alerts
International Travel